Drying in Alzey, Mainz and surrounding areas

Our drying construction work includes a thorough implementation of the drying processes as well as dismantling work in building renovation projects. We will inform you in detail about how the equipment used works and the associated power consumption during the drying process.

The drying time is estimated at 14-21 days. After the drying work is completed, we carry out a moisture measurement, dismantle the drying equipment and document the measured values for you.

We are certified

Tailor-made drying processes

Our approach is based on individually tailored planning and execution of the drying processes. We provide advanced drying equipment that is specifically tailored to the requirements of your building to ensure efficient and thorough dehumidification of your interior spaces.

Comprehensive safety measures and mold control

The health of our customers is our top priority. We take proactive measures to avoid health risks by isolating affected areas during the drying phase and carrying out targeted mold control. Our team specializes in effectively preventing mold growth and professionally dismantling damaged components.

Transparent communication and documentation

We attach great importance to open and clear communication with our customers. From detailed explanations of how our devices work to precise documentation of power consumption and moisture measurements after the drying work has been completed.

We provide you with a complete report that you can use to clarify costs with your insurance company, administration or landlord.

Drying:

Professional dismantling:

Drying schedule:

Isolating to avoid health risks: During the drying phase, the affected areas are isolated to minimize health risks to the end customers. This includes, for example, installing barriers and warning signs to indicate that there is water damage in that area.

Mold control: Mold formation is a common problem with water damage. To prevent the formation of mold, special mold control measures are taken. These include drying the affected areas, using special mold removers and ventilating the premises.

Dismantling damaged components: First, all damaged components such as furniture, floors and walls affected by water damage are dismantled and removed.

Drying: After the sealing has been completed, mold has been removed, and damaged components have been removed, the actual drying phase begins. Special drying devices such as dehumidifiers and fan heaters are used to thoroughly dry the affected areas.

During the drying process of a building, a comprehensive rehabilitation concept is created to plan the restoration of the building. This plan includes all necessary measures to restore the building to its original condition and prevent further damage.

By following these steps, professional drying companies ensure quick and effective drying after water damage to minimize health risks for end customers and prevent subsequent damage.

Electricity consumption log and cost clarification: After the drying process has been dismantled, the end customer receives an electricity consumption log, which he submits to the electricity provider. The electricity provider then states the costs incurred. The end customer can then get the costs for the electricity used reimbursed by the administration, the insurance company or the landlord.

Water damage restoration

Strong together

We attach great importance to long-term partnerships on equal terms.
If you are interested in working with us, we look forward to hearing from you.

en_GBEnglish